What if building in a virtual world
could affect the real one?

What if building in a
virtual world could affect the real one?

COMMON SPACE

COMMON SPACE

UX.UI // Web design

Studential project

Solo project

2026

an interactive web experience where users enter a shared virtual world that combines elements of gaming and interface design to create an engaging, immersive environment.

CONCEPT

CONCEPT

Nature is not only something we exist in, but something we can learn from and must respect.
In this project, nature guides principles of structure, design, and ecology, which users apply when building their own structures within a shared virtual space separated into 3 worlds inspired by air, earth, and water.
Each creation becomes part of a larger system—where digital actions eventually translate into real-world impact and contribution.


INSPIRATION

INSPIRATION

Antoni Gaudí (1852–1926) was an artist and architect based in Barcelona. 
His approach placed nature at the center, treating it as his primary source of inspiration and knowledge. Rather than using nature only as a visual reference, he translated its logic into structure, form, and function.

Through his work, I identified three core principles that became the foundation of my project: natural inspiration, structural efficiency, and ecological building.

One of Gaudí’s works that clearly reflects these principles is Casa Batlló.

Natural Inspiration:
Bone-like forms, marine

Structure Efficiency:
Curved geometry, optimized light & airflow

Eco-Build:
Natural ventilation, daylight use, local materials

USER FLOW

USER FLOW

WIREFRAMES

WIREFRAMES

DESIGN SYSTEM

DESIGN SYSTEM

typography

typography

Arcade was chosen for its pixel-based structure, reinforcing the project’s digital, game-inspired environment.

ICONS

ICONS

ICONS

AMA;LEK

AMA;LEK

MORE PROJECTS

MORE PROJECTS